LiftMaster CSW24VDC CSW24VDC Installation Manual - Page 12

Step 2 Concrete Pad And Operatorattachment, Concrete Pad And Operator, Attachment

Page 12 highlights

INSTALLATION STEP 2 CONCRETE PAD AND OPERATOR ATTACHMENT CHECK the national and local building codes before installation. NOTE: When lifting the operator use the handle to avoid damaging the operator. 1. Install the electrical conduit. 2. Pour a concrete pad (reinforced concrete is recommended). The concrete pad should be 6 inches above the ground and deeper than the frost line. Ensure the pad is tall enough to avoid possible flooding. 3. Secure the operator to the concrete pad with appropriate fasteners. NOTE: An alternative to a concrete pad is to post mount the operator (refer to accessories). CONDUIT LOCATION 5.5" 4.5" 1" 6.5" 4" 1.5" (Conduit) 3" 10" MOUNTING FOOTPRINT 13.6" 12.2" 6.1" 2.49" 28" 14" 20" 15" (Pad) 24" 14.82" (cover mounting distance) Post Mount 6" Above Ground Below the frost line. Check all national and local codes. 28" 4 Concrete Anchors 1/2" x 3 1/2" 24" 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

11
STEP 2
CONCRETE PAD AND OPERATOR
ATTACHMENT
CHECK the national and local building codes before installation.
NOTE:
When lifting the operator use the handle to avoid damaging the operator.
1. Install the electrical conduit.
2.
Pour a concrete pad (reinforced concrete is recommended). The
concrete pad should be 6 inches above the ground and deeper than
the frost line. Ensure the pad is tall enough to avoid possible flooding.
3. Secure the operator to the concrete pad with appropriate fasteners.
NOTE:
An alternative to a concrete pad is to post mount the operator
(refer to accessories).
4 Concrete
Anchors
1/2" x 3 1/2"
Below the frost line.
Check all national
and local codes.
6" Above Ground
28"
24"
Post Mount
CONDUIT LOCATION
MOUNTING FOOTPRINT
5.5"
4.5"
1"
6.5"
4"
1.5"
10"
3"
28"
20"
15"
24"
13.6"
12.2"
6.1"
2.49"
14"
14.82"
(cover mounting distance)
(Conduit)
(Pad)
INSTALLATION