Netgear FE104 Installation Guide - Page 24

Verifying Your Installation - ethernet hub

Page 24 highlights

Installation Guide for the Model FE104 and Model FE108 Fast Ethernet Hubs Verifying Your Installation When installation is complete and power has been applied to the hub, the following conditions should exist: • The Pwr (power) LED on the front panel is on. • The Link/Rx LED on each connected port is on. • The Link/Rx LED on the connected port is blinking when data is being received by that port. • The Utilization % LED on the front panel is on and shows the percentage of utilization when data is being received by any port on the hub. If there are any problems, refer to Chapter 4, "Troubleshooting." 3-6 Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44

Installation Guide for the Model FE104 and Model FE108 Fast Ethernet Hubs
3-6
Installation
Verifying Your Installation
When installation is complete and power has been applied to the hub, the following conditions
should exist:
The Pwr (power) LED on the front panel is on.
The Link/Rx LED on each connected port is on.
The Link/Rx LED on the connected port is blinking when data is being received by that port.
The Utilization % LED on the front panel is on and shows the percentage of utilization when
data is being received by any port on the hub.
If there are any problems, refer to Chapter 4, “Troubleshooting.”