Netgear FE108 Installation Guide - Page 19
Installation, Preparing the Site
UPC - 606449000894
View all Netgear FE108 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
Chapter 3 Installation This chapter provides information and procedures for: • Preparing the site • Checking package contents • Installing a NETGEAR 100BASE-T hub • Verifying your installation Preparing the Site Before you begin installing the hub, prepare the installation site. Make sure the operating environment meets the physical requirements of the equipment as listed in Table 3-1. Table 3-1. Operating environment requirements Characteristic Requirements Temperature Ambient temperature between 0° and 40° C (32° F and 104° F). No nearby heat sources such as direct sunlight, warm air exhausts, or heaters. Humidity Between 5% and 85% noncondensing. Ventilation Minimum 2 inches (5.08 cm) on all sides for cooling. Adequate airflow in room or wiring closet. Operating conditions At least 6 feet (1.83 m) to nearest source of electromagnetic noise (example is a photocopy machine). Service access Minimum 12 inches (19.68 cm) front and back for service access and maintenance. Front and back clearance for cables and wiring hardware such as punchdown blocks. Power Adequate power source within 6 feet (1.83 m). Wiring hardware Wiring hardware, such as punchdown blocks or patch panels, should be complete before installing the hub. Installation 3-1