Netgear FS750AT FS750 Reference Manual - Page 26

Preparing the Site

Page 26 highlights

Preparing the Site Before you install your switch, be sure your operating environment meets the operating environment requirements in Table 4-1. Table 4-1. Site Requirements Characteristics Requirements Mounting Desktop installations: Provide a flat table or shelf surface. Rack-mount installations: Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically secure. You also need the rack-mount kit supplied with your switch. Access Locate the switch in a position that lets you access the front panel RJ-45 ports, view the front panel LEDs, and access the rear-panel stacking port(s) and power connector. Power source Provide a power source within 6 feet (1.8 meters) of the installation location. Power specifications for the switches are shown in Appendix A. Be sure the AC outlet is not controlled by a wall switch, which can accidentally turn off power to the outlet and the switch. Environmental Temperature: Install the switch in a dry area, with ambient temperature between 0 and 40ºC (32 and 104ºF). Keep the switch away from heat sources such as direct sunlight, warm air exhausts, hot-air vents, and heaters. Operating humidity: The installation location should have a maximum relative humidity of 90%, non-condensing. Ventilation: Do not restrict airflow by covering or obstructing air inlets on the sides of the switch. Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. Be sure there is adequate airflow in the room or wiring closet where you intend to install the switch. Operating conditions: Keep the switch at least 6 ft (1.83 m) away from nearest source of electro magnetic noise, such as a photocopy machine. After confirming that your site meets the requirements in Table 4-1, you are ready to install the switch. installation 4-2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

installation
4-2
Preparing the Site
Before you install your switch,be sure your operating environment meets the operating
environment requirements in Table 4-1.
Table 4-1. Site Requirements
Characteristics
Requirements
Mounting
Desktop installations:
Provide a flat table or shelf surface.
Rack-mount installations:
Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is
grounded and physically secure.You also need the rack-mount kit supplied
with your switch.
Access
Locate the switch in a position that lets you access the front panel RJ-45
ports, view the front panel LEDs, and access the rear-panel stacking port(s)
and power connector.
Power source
Provide a power source within 6 feet (1.8 meters) of the installation
location. Power specifications for the switches are shown in Appendix A. Be
sure the AC outlet is not controlled by a wall switch, which can accidentally
turn off power to the outlet and the switch.
Environmental
Install the switch in a dry area, with ambient temperature between 0 and
Temperature:
40
º
C (32 and 104
º
F). Keep the switch away from heat sources such as
direct sunlight, warm air exhausts, hot-air vents, and heaters.
Operating humidity:
The installation location should have a maximum relative humidity of
90%, non-condensing.
Ventilation:
Do not restrict airflow by covering or obstructing air inlets on the sides of
the switch. Keep at least 2 inches (5.08 centimeters) free on all sides for
cooling. Be sure there is adequate airflow in the room or wiring closet where
you intend to install the switch.
Operating conditions:
Keep the switch at least 6 ft (1.83 m) away from nearest source of electro
magnetic noise, such as a photocopy machine.
After confirming that your site meets the requirements in Table 4-1,you are ready to
install the switch.