Netgear GS724Tv4 Hardware Installation Guide - Page 22

Step 1: Prepare the Site, Table 4., Site Requirements

Page 22 highlights

GS716T, GS724T and GS748T Gigabit Smart Switch Step 1: Prepare the Site Before you install the switch, ensure the operating environment meets the operating environment requirements in the following table. Table 4. Site Requirements Characteristics Requirements Mounting • Desktop installations - Provide a flat table or shelf surface. • Rack-mount installations - Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically secure. The rack-mount kit supplied with the switch is also required. Access Locate the switch in a position that allows access to the front panel RJ-45 ports, view the front panel LEDs, and access power connector. Power source Provide a power source within 6 feet (1.8 meters) of the installation location. Power specifications for the switch are shown in GS716T/GS724T Back Panel Configuration Ensure the AC outlet is not controlled by a wall switch, which can accidentally turn off power to the outlet and the switch. Environmental • Temperature - Install the switch in a dry area, with ambient temperature between 0 and 55ºC (32 and 131ºF). Keep the switch away from heat sources such as direct sunlight, warm air exhausts, hot-air vents, and heaters. • Operating humidity - The installation location should have a maximum relative humidity of 90%, non-condensing. • Ventilation - Do not restrict airflow by covering or obstructing air inlets on the sides of the switch. Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. Be sure there is adequate airflow in the room or wiring closet where the switch is installed. • Operating conditions - Keep the switch at least 6 ft. (1.83 m) away from nearest source of electromagnetic noise, such as a photocopy machine. 18

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

18
GS716T, GS724T and GS748T Gigabit Smart Switch
Step 1: Prepare the Site
Before you install the switch, ensure the operating environment meets the operating
environment requirements in the following table.
Table 4.
Site Requirements
Characteristics
Requirements
Mounting
Desktop installations
- Provide a flat table or shelf surface.
Rack-mount installations
- Use a 19-inch (48.3-centimeter) EIA standard
equipment rack that is grounded and physically secure. The rack-mount kit supplied
with the switch is also required.
Access
Locate the switch in a position that allows access to the front panel RJ-45 ports, view the
front panel LEDs, and access power connector.
Power source
Provide a power source within 6 feet (1.8 meters) of the installation location. Power
specifications for the switch are shown in
GS716T/GS724T Back Panel Configuration
Ensure the AC outlet is not controlled by a wall switch, which can accidentally turn off
power to the outlet and the switch.
Environmental
Temperature
- Install the switch in a dry area, with ambient temperature between 0
and 55ºC (32 and 131ºF). Keep the switch away from heat sources such as direct
sunlight, warm air exhausts, hot-air vents, and heaters.
Operating humidity
- The installation location should have a maximum relative
humidity of 90%, non-condensing.
Ventilation
- Do not restrict airflow by covering or obstructing air inlets on the sides
of the switch. Keep at least 2 inches (5.08 centimeters) free on all sides for cooling.
Be sure there is adequate airflow in the room or wiring closet where the switch is
installed.
Operating conditions
- Keep the switch at least 6 ft. (1.83 m) away from nearest
source of electromagnetic noise, such as a photocopy machine.