Netgear GSM7212P GSM5212P/GSM7212P/GSM7212F/GSM7224P Hardware Installation Gui - Page 15

Check the Installation, Installing the Switch on a Wall

Page 15 highlights

NETGEAR Managed Switch 8. Tighten the screws with a No. 2 Phillips screwdriver to secure the switch in the wall. Figure 8. Installing the Switch on a Wall Check the Installation Before you apply power, perform the following checks: 1. Inspect the equipment thoroughly. 2. Verify that all cables are installed correctly. 3. Check cable routing to ensure that cables are not damaged and will not create a safety hazard. 4. Be sure that all equipment is mounted properly and securely. Hardware Installation 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

Hardware Installation
15
NETGEAR Managed Switch
8.
Tighten the screws with a No. 2 Phillips screwdriver to secure the switch in the wall.
Figure 8.
Installing the Switch on a Wall
Check the Installation
Before you apply power, perform the following checks:
1.
Inspect the equipment thoroughly.
2.
Verify that all cables are installed correctly.
3.
Check cable routing to ensure that cables are not damaged and will not create a safety
hazard.
4.
Be sure that all equipment is mounted properly and securely.