Panasonic TY-TP50P10S Operating Instructions - Page 8

Touch Panel Assembly

Page 8 highlights

Touch Panel Assembly 1 Lay the top, side and bottom units on the packaging cushions. ㊍ Arrange the packaging cushions (6) on the floor so that their arrows point in the same Packaging direction. cushions ㊎ Set the top, side and bottom units inside the grooves of the packaging cushions. (The arrows on the right and the left units should point toward the top unit.) Top unit Caution Touch panel projections can be damaged if exposed, therefore lay panel parts in the packaging cushions to assemble. 2 Lock the side units to the top unit. ㊍ Align the projections on the panel support plate of the top unit with the holes on the left and right units. Mounting ㊎ Lock the left and right units to the top screws B unit with mounting screws B (4). Bottom unit Panel support plate Top unit Arrow Notes on Assembly • The installation hole of mounting screw B differs for the left and right units. • If the parts do not fit together properly, switch the left and right units and try again. Arrow 3 Lock the bottom unit to the side units. ㊍ Align the projections on the panel support plate of the bottom unit with the holes on the left and right units. ㊎ Lock the left and right units to the bottom unit with mounting screws B (4). Mounting screws B 8 Panel support plate

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

8
Lay the top, side and bottom units on the packaging cushions.
Arrange the packaging cushions (6) on the
oor so that their arrows point in the same
direction.
Set the top, side and bottom units inside the
grooves of the packaging cushions.
(The arrows on the right and the left units
should point toward the top unit.)
Lock the side units to the top unit.
Align the projections on the panel
support plate of the top unit with the
holes on the left and right units.
Lock the left and right units to the top
unit with mounting screws B (4).
Touch Panel Assembly
Lock the bottom unit to the side units.
Align the projections on the panel support
plate of the bottom unit with the holes on
the left and right units.
Lock the left and right units to the bottom
unit with mounting screws B (4).
Caution
Touch panel projections can be damaged if
exposed, therefore lay panel parts in the packaging
cushions to assemble.
Notes on Assembly
• The installation hole of mounting screw B differs for the left and right units.
• If the parts do not
t together properly, switch the left and right units and try again.
1
2
3
Top unit
Bottom unit
Arrow
Top unit
Arrow
Mounting
screws B
Mounting
screws B
Panel support plate
Packaging
cushions
Panel support plate