Panasonic WJ-GXE100 Installation Guide - Page 14
Major operating controls
View all Panasonic WJ-GXE100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
Major operating controls 12 V DC power supply terminal Network connector Live indicator When the power is turned on When connected to a network (not accessed) When connected to a network (accessed) Lights green Lights orange Blinks orange/ Blinks green INITIAL SET button Mounting hole q Ventilation area (also on the other side of the unit) Mounting hole w About the [INITIAL SET] button After turning off the power of the unit, turn on the power of the unit while holding down this button, and wait for around 5 seconds or more without releasing this button. Wait around 2 minutes after releasing the button. The unit will start up and the settings including the network settings will be initialized. Do not turn off the power of the unit during the process of the initialization. Before initializing the settings, it is recommended to write down the settings in advance. 14