Panasonic WJ-GXE100 Installation Guide - Page 16

Preparations

Page 16 highlights

Preparations The screws used to mount the unit to a wall or ceiling are not supplied. Prepare the screws according to the material, structure, strength and other factors of the mounting area and the total weight of objects to be mounted. IMPORTANT: • Purchase 2 screws (M3) according to the material of the installation area. Nails cannot not be used for mounting. • Required pull-out capacity of a single screw/bolt is 196 N {44.06 lbf} or more. • Do not mount this product on a plaster board or a wooden section because they are too weak. If this product is unavoidably mounted on such a section, the section shall be sufficiently reinforced. 16

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

16
Preparations
The screws used to mount the unit to a wall or ceiling are not supplied.
Prepare the screws according to the material, structure, strength and other factors of the mounting
area and the total weight of objects to be mounted.
IMPORTANT:
• Purchase 2 screws (M3) according to the material of the installation area. Nails cannot not be
used for mounting.
• Required pull-out capacity of a single screw/bolt is 196 N {44.06 lbf} or more.
• Do not mount this product on a plaster board or a wooden section because they are too weak.
If this product is unavoidably mounted on such a section, the section shall be sufficiently rein-
forced.