Pfaff GrandQuilter 18.8 Owner's Manual - Page 26

Timing between needle and rotating hook

Page 26 highlights

Fig 25: Tighten screw on your machine. Fig 26: Tension assembly back in place with new check spring at 11:00 Fig 27: For fine adjustment of check spring insert screwdriver turn clockwise for more tension Timing between needle and rotating hook Remove the two needle plate screws from your machine. You will also need to remove the three Face plate screws The protecting flange of the position bracket A should be engaged in the notch B of the bobbin case holder. D is set screw to adjust hook timing. (Photo on the right is actual machine as shown in Drawing) Drawing and photo show correct timing. 26

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

26
Fig 25:
Tighten screw on your
machine.
Fig 26:
Tension assembly back in
place with new check spring at
11:00
Fig 27:
For fine adjustment of
check spring insert screwdriver
turn clockwise for more tension
Timing between needle and rotating hook
Remove the two needle plate screws
You will also need to remove the three
from your machine.
Face plate screws
The protecting flange of the position bracket A should be engaged in the notch B of the bobbin case holder.
D
is set screw to adjust hook timing.
(Photo on the right is actual machine as shown in Drawing)
Drawing and photo show correct timing.