Sharp VL-A111UL Service Manual - Page 23

lever, pinch lever.

Page 23 highlights

(8) Install the drum assembly in the chassis. (9) Install the tape guide in the drum assembly. (10) Install the Si roller. B (11) Install the slide chassis. T arm guide VL-A111U/AH131U VL-AH151U/AH161U Tape guide A Drum assembly A A Slide this part towards the T arm. Place the slide chassis on the guide rail. A B Si roller Roller spring B Main cam pin B Insert the main cam pin into the hole of cam of slide chassis. Sup reel base Chassis drawing Item A S tight M1.7 x L5.3 B S tight M1.7 x L2.5 Tightening torque 100mN·m 60mN·m Quantity 3 1 Item A M1.4 x 1.5 ø4.5 B M1.4 x 1.5 ø3.5 Tightening torque 40mN·m 40mN·m Quantity 1 3 (12) Install in the following order: T guide lever spring, T guide lever, pinch lever. (13) Install the swing arm. Pinch lever (14) Install the right guide holder. Tu guide lever Hang on a hook Tu guide lever SPR Hang on a hook Take care of position. Pinch lever The pinch lever is positioned on Stopper the stopper. B Secure on back side Swing arm Claw Claw Take care not to bend the tension band during assembly or disassembly. A Item Tightening torque A S tight M1.4 x 2.5 70mN·m B CW ø0.8-ø3-t0.2 70mN·m Quantity 1 1 23

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99

23
VL-A111U/AH131U
VL-AH151U/AH161U
(8) Install the drum assembly in the chassis.
(9) Install the tape guide in the drum assembly.
(10) Install the Si roller.
(11) Install the slide chassis.
Item
Tightening torque
Quantity
A
S tight M1.7 x L5.3
100mN·m
3
B
S tight M1.7 x L2.5
60mN·m
1
A
Si roller
Roller spring
Drum assembly
A
Chassis drawing
A
Tape guide
B
A
B
B
B
T arm guide
Slide this part towards the T arm.
Place the slide chassis
on
the guide rail.
Main cam pin
Sup reel base
Insert the main cam pin into the
hole of cam of slide chassis.
Item
Tightening torque
Quantity
A
S tight M1.4 x 2.5
70mN·m
1
B
CW ø0.8-ø3-t0.2
70mN·m
1
Take care not to bend the
tension band during assembly
or disassembly.
Pinch lever
Tu guide lever
Tu guide lever SPR
Hang on a hook
Hang on a hook
Take care of position.
Pinch lever
Stopper
The pinch lever
is positioned on
the stopper.
Secure on back side
B
A
Claw
Claw
Swing arm
(12) Install in the following order: T guide lever spring, T guide
lever, pinch lever.
(13) Install the swing arm.
(14) Install the right guide holder.
Item
Tightening torque
Quantity
A
M1.4 x 1.5 ø4.5
40mN·m
1
B
M1.4 x 1.5 ø3.5
40mN·m
3