TP-Link TL-SG5412F TL-SG5412F V1 IG 7106503848 - Page 21

Initialization, ´1µ

Page 21 highlights

L2 Managed Switch FFFFFFFFFFFFConnecting to Power Supply Note: The figure is to illustrate the application and principle. The power cord you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above. 4444Initialization After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond as follows: ■■ The PWR LED indicator will light on all the time. ■■ After keeping off for several seconds, the LED indicators of all the ports will flash momentarily and then turn off again after the initialization. ■■ The SYS LED indicator will flash, which represents a successful initialization. Connection 16

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

16
L2 Managed Switch
Connecting to Power Supply
Figure 4-5
Note:
The figure is to illustrate the application and principle. The power cord you get
from the package and the socket in your situation will comply with the regulation in
your country, so they may differ from the figure above.
Initialization
´1µ
After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond as follows:
The PWR LED indicator will light on all the time.
After keeping off for several seconds, the LED indicators of all the ports will flash
momentarily and then turn off again after the initialization.
The SYS LED indicator will flash, which represents a successful initialization.
Connection