Tripp Lite 9PX6KL Eaton 9PX 6KVA Lithium-Ion Advanced Users Guide 9PX6K-L 9PXE - Page 23

Connecting the EBM's

Page 23 highlights

Connecting the EBM's 2 poles circuit breaker L1 N(L2) to UPS Normal AC source G N(L2) L1 2. Recommended cable cross-sections Terminal Position Wire Function L1 N (L2) Phase Neutral (Phase) Ground Terminal Wire Size Minimum Input Rating Wire Size Tightening Torque 4-16 mm2 (12-6 AWG) 6 mm2 (10 AWG) 105° C 10 mm2 (8 AWG) 75°C Min 10 mm2 for ground 10 lb in / 1.13 Nm 3.7 Connecting the EBM's A small amount of arching may occur when connecting an EBM to the UPS. This is normal and will not harm personnel. Insert the EBM cable into the UPS battery connector quickly and firmly. 1. Plug the EBM power cable(s) into the battery connector(s). Up to 4 EBMs may be connected to the UPS. 2. Verify that the EBM connections are tight and that adequate bend radius and strain relief exist for each cable. 3. Connect the battery detection cable(s) to the connector of the UPS and of the EBM(s). NOTE The EBM communication wiring connections are directional and must be connected in the correct sequence to ensure proper detection, regulation and lifecycle monitoring of the integrated battery management system (BMS). When multiple EBMs are used in parallel, or when a new EBM is connected, please note that the voltage difference between the different EBM's should not be to large, less than 5V is recommended. 4. Turn the DC breaker on each EBM to the "ON" position. Eaton 9PX Lithium-Ion User Guide DPD-9PX2206-Rev 01 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50

Eaton 9PX Lithium-Ion User Guide
DPD-9PX2206—Rev 01
17
2 poles circuit breaker
G N(L2)
L1
N(L2)
L1
to UPS Normal AC source
2.
Recommended cable cross-sections
Terminal Position
Wire Function
Terminal Wire Size
Rating
Minimum Input
Wire Size
Tightening Torque
L1
Phase
4-16 mm2 (12-6 AWG)
6 mm2 (10 AWG) 105°
C
10 mm2 (8 AWG) 75°C
Min 10 mm2 for
ground
10 lb in / 1.13 Nm
N (L2)
Neutral
(Phase)
Ground
3.7
Connecting the EBM’s
A small amount of arching may occur when connecting an EBM to the UPS. This is normal and will not harm
personnel. Insert the EBM cable into the UPS battery connector quickly and firmly.
1.
Plug the EBM power cable(s) into the battery connector(s). Up to 4 EBMs may be connected to the UPS.
2.
Verify that the EBM connections are tight and that adequate bend radius and strain relief exist for each
cable.
3.
Connect the battery detection cable(s) to the connector of the UPS and of the EBM(s).
NOTE
The EBM communication wiring connections are directional and must be connected in
the correct sequence to ensure proper detection, regulation and lifecycle monitoring of
the integrated battery management system (BMS). When multiple EBMs are used in
parallel, or when a new EBM is connected, please note that the voltage difference
between the different EBM’s should not be to large, less than 5V is recommended.
4.
Turn the DC breaker on each EBM to the “ON” position.
Connecting the EBM’s