Viking VDR548 Installation Instructions - Page 20
wire con't
![]() |
View all Viking VDR548 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
Electrical Connection (4-wire con't) 7 1 8 Push supply cord toward terminal block to relieve strain, reattach supply cord strain relief bracket over supply cord. Reattach access door. Leveling/Adjustments/Alignment 1 2 Measure the four corners in cutout area to verify if flooring is level. For uneven or sloped floors, level unit with metal shims only, as the adjustment required may exceed the thread available in the legs.
![](/manual_guide/products/viking-vdr530-installation-instructions-ea80cdd/20.png)
Electrical Connection
(4-wire con’t)
1
2
Measure the four corners in cutout area to verify if
flooring is level.
For uneven or sloped floors, level unit with metal shims
only, as the adjustment required may exceed the thread
available in the legs.
Leveling/Adjustments/Alignment
1
1
7
8
Push supply cord toward terminal
block to relieve strain, reattach supply cord strain
relief bracket over supply cord.
Reattach access door.