Viking VRT LP/Propane Conversion Kit - LPKPDR - Installation Instructions - Page 6
Infrared Broiler Conversion
View all Viking VRT manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Infrared Broiler Conversion IMPORTANT: The infrared broiler orifice must be changed from rear of range before unit is installed. Locate bag labeled IR Broiler Orifice. Remove nut securing 90 degree fitting and broiler tubing to rear of range. Broil Nut Remove Orifice from 90 degree fitting and replace with orifice from bag labeled IR Broiler Orifice. Reverse procedure as needed to reassemble. Preparing for Top Surface Conversion Remove all grates, burner bowls, grate supports, surface burner caps, griddle, grill grates and grill grate supports. NOTE: Some models may not be equipped with all parts mentioned above. IMPORTANT: For models equipped with griddles, notice position of griddle temperature probe for proper reinstallation. Failure to properly reinstall could result in damage to griddle temperature probe. 6