Weider 3550 User Manual - Page 12
VKR High Cable 74. Screw the end of the Cable - cable routing
View all Weider 3550 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
20. Remove the preattached 3 1/2" Pulleys (78 [only one is shown]) from the Offset Double "U"- 20 bracket (61). Wrap the VKR High Cable (74) under a 3 1/2" Pulley (78). Attach the Pulley to the Offset Double "U"-bracket (61) with a 3/8" x 1 3/4" Bolt (93) and a 3/8" Nylon Locknut (87). 21. Wrap the VKR High Cable (74) over a 4 1/2" Pulley 21 (119). Attach the Pulley inside of the indicated bracket on the Top Frame (6) with 3/8" x 1 3/4" Bolt (93) and a 3/8" Nylon Locknut (87). 74 78 93 87 61 6 87 93 119 74 22. Place a 1/2" Washer (1) on top of the Weight Tube 22 (43) closest to the VKR Upright (5). Tighten a 1/2" Nut (118) halfway onto the end of the VKR High Cable (74). Screw the end of the Cable two full turns into the Weight Tube (43). Then, tighten the Nut against the 1/2" Washer (1). 5 74 118 43 1 23. Locate the Lat Cable (88), which is 89 1/4" long and has an eyelet on one end and a ball on the other end. Route the eyelet end of the Cable up through the Butterfly Top Frame (7) and around a 3 1/2" Pulley (78). Attach the Pulley inside of the Butterfly Top Frame with a 3/8" x 2 3/4" Bolt (101), two 3/8" Washers (91), two 1/2" Spacers (89), and a 3/8" Nylon Locknut (87). 23 78 87 91 89 88 12 7 91 101