Weider E2000 English Manual - Page 18
Trouble-shooting And Maintenance
View all Weider E2000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
39. Note: The console cord should be positioned between 39 the two bottom screws on the Shroud. Align the Right Shroud (79) with the holes in the Top Frame (1), the Base (8), and the two Uprights (18, 42 [not shown]) and attach it with 14 #8 x 3/4Ó Tap Screws (80). See the inset drawing. Attach the power cord jack to 80 the inside of the Right Shroud (79) with two #8 x 1/2Ó Screws (87). 1 79 18 80 80 87 40. Align the Left Shroud (78) with the holes in the Top 40 Frame (1), the Base (8), and the two Uprights (18, 42) and attach it with 14 #8 x 3/4Ó Tap Screws (80). 41. Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in HOW TO USE THE WEIGHT SYSTEM, beginning on page 20 of this manual. Before using the weight system, pull each cable a few times to be sure that the cables move smoothly over the pulleys. If one of the cables does not move smoothly, find and correct the problem. IMPORTANT: If the cables are not properly installed, they may be damaged when heavy weight is used. If there is any slack in the cables, you will need to remove the slack by tightening the cables. See TROUBLE-SHOOTING AND MAINTENANCE on page 21. 80 80 Power Cord 8 Jack Console 80 Cord 18 78 1 80 80 42 80 80 80 8 80 80 18