Weider Pro 3200 English Manual - Page 11

Cable Assembly

Page 11 highlights

CABLE ASSEMBLY 17. IMPORTANT: While assembling the cables, do not overtighten the locknuts attaching the pulleys; the pulleys must be able to turn freely. Refer to the CABLE DIAGRAMS and the CABLE ID CHART on pages 24 and 25 for help identifying the cables and for proper cable routing. Locate the High Cable (45). Route the Cable up through the Left Top Frame (3) and around a 90mm Pulley (38). Attach the Pulley inside the Top Frame with an M10 x 70mm Bolt (81), two M10 Washers (75), two 13mm Spacers (34), and an M10 Nylon Locknut (70). 18. Route the High Cable (45) around a 90mm Pulley (38) and down through the Left Top Frame (3). Attach the Pulley and a Cable Trap (91) inside the Top Frame with an M10 x 70mm Bolt (81), two M10 Washers (75), two 13mm Spacers (34), and an M10 Nylon Locknut (70). Be sure the Cable Trap is turned to hold the Cable in the groove of the Pulley. Note: To complete this step, it may be necessary to loosen the indicated M10 Nylon Locknuts (70). Retighten the Locknuts when this step is completed. 19. Wrap the High Cable (45) around a 90mm Pulley (38). Attach the Pulley to the single hole side of the Adjustable Double "U"-Bracket (56) with an M10 x 45mm Bolt (66) and an M10 Nylon Locknut (70). 17 38 3 75 70 34 34 81 75 45 18 91 38 34 75 81 70 75 34 45 3 70 19 45 38 70 66 56 20. Note: The following drawings are shown from 20 the left side of the weight system, with the Left Top Frame (3) removed for clarity. Wrap the High Cable (45) around a 90mm Pulley (38). Attach the Pulley at the rear hole, inside of the bracket on the Center Top Frame (14) with an M10 x 45mm Bolt (66) and an M10 Nylon Locknut (70). 70 14 38 45 66 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

11
20.
Note: The following drawings are shown from
the left side of the weight system, with the
Left Top Frame (3) removed for clarity.
Wrap the High Cable (45) around a 90mm Pulley
(38). Attach the Pulley at the rear hole, inside of
the bracket on the Center Top Frame (14) with an
M10 x 45mm Bolt (66) and an M10 Nylon Locknut
(70).
17.
Locate the High Cable (45).
Route the Cable up
through the Left Top Frame (3) and around a
90mm Pulley (38). Attach the Pulley inside the
Top Frame with an M10 x 70mm Bolt (81), two
M10 Washers (75), two 13mm Spacers (34), and
an M10 Nylon Locknut (70).
18. Route the High Cable (45) around a 90mm Pulley
(38) and down through the Left Top Frame (3).
Attach the Pulley and a Cable Trap (91) inside
the Top Frame with an M10 x 70mm Bolt (81),
two M10 Washers (75), two 13mm Spacers (34),
and an M10 Nylon Locknut (70).
Be sure the
Cable Trap is turned to hold the Cable in the
groove of the Pulley.
Note: To complete this step, it may be neces-
sary to loosen the indicated M10 Nylon
Locknuts (70). Retighten the Locknuts when
this step is completed.
19. Wrap the High Cable (45) around a 90mm Pulley
(38). Attach the Pulley to the single hole side of
the Adjustable Double ā€œUā€-Bracket (56) with an
M10 x 45mm Bolt (66) and an M10 Nylon Locknut
(70).
38
45
75
70
81
75
34
3
34
17
3
34
75
34
75
81
38
70
70
91
45
18
70
56
38
66
45
19
38
66
70
45
14
20
CABLE ASSEMBLY
IMPORTANT: While assembling the cables,
do not overtighten the locknuts attaching
the pulleys; the pulleys must be able to turn
freely. Refer to the CABLE DIAGRAMS and
the CABLE ID CHART on pages 24 and
25
for help identifying the cables and for prop-
er cable routing.