Whirlpool GZ7930XHS Installation Guide - Page 10

Recommended standard, fittings

Page 10 highlights

Recommended standard fittings support leg cabinet floor. Align top of legs with pencil marks on face of downdraft vent. Tighten screws in legs. 90° elbow = 5 ft. (1.5 m) 45° elbow = 2.5 ft. (0.8 m) Installation steps 1. Put on gloves and safety glasses. Place cardboard or another form of protection on top of a flat surface where you can easily assemble the downdraft vent system. Remove parts packages, downdraft vent and blower box from carton. Remove all shipping materials, tape and protective film from downdraft vent and blower box. 4. Attach support legs to side of downdraft vent with two screws in each leg. Do not tighten screws. WARNING Excessive Weight Hazard Use two or more people to move and install downdraft vent. Failure to do so can result in back or other injury. over counter support arm 2. Attach the left side and right side overcounter support brackets to the downdraft. Use 1 screw with each bracket. 5. Carefully insert downdraft vent into countertop cutout. Two people are recommended to support the weight of the downdraft vent during lifting. Check that downdraft vent is parallel to side of cutout and that mounting brackets rest gently on countertop. end cap level mark 7. Attach 10" (25.4 cm) round vent collar plate (supplied with exterior blower system) to front of downdraft vent using 4 hex washer nuts. 8. Remove the 2 Phillips-head screws attaching the wiring box cover and remove cover. Remove either the back or bottom knockout and install conduit connector. NOTE: Power supply cable needed between exterior blower assembly and blower box is not provided. 9. Determine the location where the exterior blower box will be located. Cut opening in roof or wall for vent system to exterior blower. Install exterior blower according to instructions supplied with the blower kit. Wall Installations: • Use caulking compound between mounting flange and wall. Roof Installations: • Follow standard roofing procedures. • The flashing sheet should be centered over the roof opening. • Lower edge of flashing should lie on top of shingles and upper edge underneath shingles. • Seal assembly between roof, fan and flashing with roofing mastic to prevent leaks. 3. Attach the left side and right side end caps to the downdraft. Use 1 screw with each end cap. 10 6. Move support legs down against cabinet floor. Place a level against front of downdraft vent base and adjust position of legs until downdraft is level vertically. Use a pencil to mark the top of each leg on face of downdraft vent. Then mark location of support leg mounting holes on cabinet floor. Remove downdraft vent from cutout. Drill starter holes at each mounting screw location on

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

90° elbow =
5 ft. (1.5 m)
45° elbow =
2.5 ft. (0.8 m)
Recommended standard
fittings
Installation steps
1.
Put on gloves and safety
glasses. Place cardboard or another
form of protection on top of a flat
surface where you can easily
assemble the downdraft vent
system. Remove parts packages,
downdraft vent and blower box
from carton. Remove all shipping
materials, tape and protective film
from downdraft vent and blower
box.
4.
Attach support legs to side of
downdraft vent with two screws in
each leg. Do not tighten screws.
Excessive Weight Hazard
Use two or more people to move
and install downdraft vent.
Failure to do so can result in back
or other injury.
WARNING
7.
Attach 10" (25.4 cm) round
vent collar plate (supplied with
exterior blower system) to front of
downdraft vent using 4 hex washer
nuts.
5.
Carefully insert downdraft
vent into countertop cutout. Two
people are recommended to
support the weight of the
downdraft vent during lifting.
Check that downdraft vent is
parallel to side of cutout and that
mounting brackets rest gently on
countertop.
6.
Move support legs down
against cabinet floor. Place a level
against front of downdraft vent
base and adjust position of legs
until downdraft is level vertically.
Use a pencil to mark the top of
each leg on face of downdraft vent.
Then mark location of support leg
mounting holes on cabinet floor.
Remove downdraft vent from
cutout. Drill starter holes at each
mounting screw location on
8.
Remove the 2 Phillips-head
screws attaching the wiring box
cover and remove cover. Remove
either the back or bottom knockout
and install conduit connector.
NOTE:
Power supply cable needed
between exterior blower assembly
and blower box is not provided.
9.
Determine the location where
the exterior blower box will be
located. Cut opening in roof or wall
for vent system to exterior blower.
Install exterior blower according to
instructions supplied with the
blower kit.
Wall Installations:
• Use caulking compound between
mounting flange and wall.
Roof Installations:
• Follow standard roofing
procedures.
• The flashing sheet should be
centered over the roof opening.
• Lower edge of flashing should lie
on top of shingles and upper edge
underneath shingles.
• Seal assembly between roof, fan
and flashing with roofing mastic
to prevent leaks.
10
3.
Attach the left side and right
side end caps to the downdraft.
Use 1 screw with each end cap.
2.
Attach the left side and right
side overcounter support brackets
to the downdraft. Use 1 screw
with each bracket.
over counter
support arm
support leg
mark
level
end cap
cabinet floor. Align top of legs
with pencil marks on face of
downdraft vent. Tighten screws
in legs.