ZyXEL NSA320 User Guide - Page 323
The Log Screen
View all ZyXEL NSA320 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 323 highlights
Chapter 18 Maintenance Screens Table 112 Maintenance > Power Management > Edit (continued) LABEL DESCRIPTION Execute Time (hh:mm) Enter the time, day, and/or day of the month as appropriate for this power control schedule entry. Leave more than 10 minutes between the execution times of the entries. If the NSA turns off or restarts while a user is transferring files to or from the NSA, the transfer fails. The user will need to restart the transfer. The NSA skips a scheduled restart or power off if the execution time comes while the NSA is doing any of the following: • Resynchronizing a RAID • Upgrading firmware • Replacing the configuration file If the NSA is turned off at the time when a restart or power off is scheduled, the NSA does not perform the restart or power off. If the NSA is turned on at the time when a power on is scheduled, the NSA does not perform the power on. Use this part of the screen to configure power on, power off, and reboot times. Please select the This is only available if you set the Frequency to Monthly. day of the month Choose the day of each month for the power control schedule entry. Every how many weeks? This is only available if you set the Frequency to Weekly. Enter the interval between weeks and choose the day of the week for the power control schedule entry. Every how many This is only available if you set the Frequency to Daily. days? Enter the interval between days for the power control schedule entry. Add Click this to add the power control schedule to the list. Apply Click this to save your changes. Cancel Click this to return to the previous screen without saving. 18.4 The Log Screen Click Maintenance > Log to open the following screen. Media Server User's Guide 323