Cisco 7935 Administration Guide - Page 37
Safety Notices, Regulatory Compliance and Safety Information for the Cisco IP, Conference Station 7935 - power
UPC - 746320488448
View all Cisco 7935 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 37 highlights
Chapter 2 Installation of the Cisco IP Conference Station 7935 Installing the Cisco IP Conference Station 7935 Safety Notices These are the safety considerations for using the IP Conference Station. Read these notices before you install or use the IP Conference Station. You can also refer to the Regulatory Compliance and Safety Information for the Cisco IP Conference Station 7935 for international agency compliance, safety, and statutory information for the Cisco IP Conference Station 7935. Warning Read the installation instructions before you connect the system to its power source. Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment. Warning Ultimate disposal of this product should be handled according to all national laws and regulations. Warning Do not work on the system or connect or disconnect cables during periods of lightning activity. Warning To avoid electric shock, do not connect safety extra low voltage (SELV) circuits to telephone network voltage (TNV) circuits. LAN ports contain SELV circuits, and WAN ports contain TNV circuits. Some LAN and WAN ports both use RJ-45 connectors. Use caution when connecting cables. Warning This product relies on the building's installation for short-circuit (overcurrent) protection. Ensure that a fuse or circuit breaker no larger than 120 VAC, 15 A U.S. (240 VAC, 10 A international) is used on the phase conductors (all current-carrying conductors). 78-12727-03 Cisco IP Conference Station 7935 Administration Guide 2-9