Fisher and Paykel RDV3-304-N Installation Guide - Page 18

Toe kick installation, Levelling the range, Turn feet to adjust the height.

Page 18 highlights

TOE KICK INSTALLATION Insert both foot covers into the 1 toe kick ensuring the long hem edge is facing the inside of the 1 product. Long hem edge FRONT VIEW LEVELLING THE RANGE PROFILE VIEW To expose both front feet, slide the interlocking foot covers out of the way. Turn feet to adjust the height. Align the toe kick with side panels of the range. 2 Clip into place by rotating and 2 pushing the bracket down over the range structure. CROSS SECTION PROFILE VIEW PROFILE VIEW Replace both sets of covers, ensuring each set locks together. PRIOR TO FINAL POSITIONING z Ensure the doors and toe kick panel are securely in place, if removed previously. 3 Check toe kick is flush with the range and secure using 2 screws. z Ensure any backguard is fitted prior to final positioning. Refer to "Backguard considerations" for the backguard options. z Ensure all electrical and gas connections have been done as per instructions. z Ensure flooring and adjacent cabinetry are also level. To achieve a flush fit of the range to adjoining countertops, it will be necessary to have level cabinets (front to back, and left to right across opening of the range). FRONT VIEW 18

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

18
1
1
2
2
3
Replace both sets of covers,
ensuring each set locks
together.
Insert both foot covers into the
toe kick ensuring the long hem
edge is facing the inside of the
product.
Align the toe kick with side
panels of the range.
Clip into place by rotating and
pushing the bracket down over
the range structure.
Check toe kick is flush with the
range and secure using 2 screws.
To expose both front feet,
slide the interlocking foot
covers out of the way.
Turn feet to adjust the height.
Long hem edge
z
Ensure the doors and toe kick panel are securely in place, if removed previously.
z
Ensure any backguard is fitted prior to final positioning. Refer to "Backguard
considerations" for the backguard options.
z
Ensure all electrical and gas connections have been done as per instructions.
z
Ensure flooring and adjacent cabinetry are also level. To achieve a flush fit of the range to
adjoining countertops, it will be necessary to have level cabinets (front to back, and left
to right across opening of the range).
TOE KICK INSTALLATION
LEVELLING THE RANGE
PRIOR TO FINAL POSITIONING
FRONT VIEW
FRONT VIEW
CROSS SECTION PROFILE VIEW
PROFILE VIEW
PROFILE VIEW