GE GTUP240EMWW Installation Instructions - Page 9
Warning, Caution - side vent
UPC - 084691228998
View all GE GTUP240EMWW manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
Installation Instructions 6 DRYER EXHAUST TO RIGHT, LEFT OR BOTTOM CABINET WARNING - BEFORE PERFORMING THIS EXHAUST INSTALLATION, BE SURE TO DISCONNECT THE APPLIANCE FROM ITS ELECTRICAL SUPPLY. PROTECT YOUR HANDS AND ARMS FROM SHARP EDGES WHEN WORKING INSIDE THE CABINET. BE SURE TO WEAR GLOVES For downward venting, rotate elbow sections so that elbow points downward ADDING ELBOW AND DUCT FOR EXHAUST TO LEFT OR RIGHT SIDE OF CABINET • For side ducting, remove the knockout (ONLY 1). Rotate elbow sections so that the points to the side. Preassemble 4" elbow with 4" duct. Use only 4" UL approved rigid metal for ducting inside the dryer. • Insert duct assembly through the side opening and connect to the internal elbow. CAUTION: Be sure not to pull or damage the electrical wires inside the dryer when inserting the duct . REMOVE C H DESIRED KNOCKOUT (ONLY 1) 4" UL approved rigid metal C H FLOOR C H DUCT TAPE • Apply duct tape as shown on the joint between the dryer internal duct and the straight duct pipe. CAUTION: Internal duct joints must be secured with tape, otherwise they may separate and cause a safety hazard. 9