GE PD900DP Installation Instructions - Page 13
Final Checklist, Operation Checklist
View all GE PD900DP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
Installation Instructions Final Checklist Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced. Be sure power is in service to the building. Check to be sure that all packing materials and tape on metal panel (if applicable) under control knobs and drawer have been removed. Operation Checklist Check to make sure the Clock display is energized. If a series of horizontal red lines appear in the display, disconnect power immediately. Recheck the range wiring connections. If change is made to connections, retest again. If no change is required, have building wiring checked for proper connections and voltage. It is recommended that the clock be changed if the red lines appear. Push down and turn any one of the four surface knobs to "MED" setting to observe that the element glows within 15 seconds. Turn the knob off when glow is detected. If the glow is not detected within the time limit, recheck the range wiring connections. If change is required, retest again. If no change is required, have building wiring checked for proper connections and voltage. 13