GE PD900DP Installation Instructions - Page 4

Pre-Installation Cutout and Required, Clearances

Page 4 highlights

Installation Instructions A Pre-Installation Cutout and Required Clearances NOTE: Drop-In Ranges are designed to hang from the countertop only. Do not install on a platform or support rails. If cabinets are placed less than 30" min. above the range, see alternate construction. 30" ranges conform to U.L. requirements for 0" spacing from vertical walls below countertops. Allow 1/4" minimum clearance at the back wall above the countertop. Wall coverings, counters and cabinets around range must withstand heat (up to 194°F) generated by the range. 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

4
Installation Instructions
NOTE: Drop-In Ranges are designed to hang
from the countertop only. Do not install on
a platform or support rails.
Pre-Installation Cutout and Required
Clearances
A
If cabinets are placed less than
30” min. above the range, see
alternate construction.
30” ranges conform to U.L.
requirements for 0” spacing from
vertical walls below countertops.
Allow 1/4” minimum clearance
at the back wall above the
countertop.
Wall coverings, counters and
cabinets around range must
withstand heat (up to 194°F)
generated by the range.