HP BL260c Delivering an Adaptive Infrastructure with the HP BladeSystem c-Clas - Page 4
Complexity and management, Source: IDC Technical Brief Sponsored by HP - blade server
UPC - 883585668663
View all HP BL260c manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
Figure 1. Annual amortized cost of a fully-configured 1U server in a mission-critical (Tier IV) data center Complexity and management Increasingly, the greatest ongoing operational cost is the combined management cost associated with servers, storage, and networking hardware (Figure 2). Figure 2. Cost of server hardware in relation to total management costs Source: IDC Technical Brief Sponsored by HP, Next-Generation Technology for Virtual I/O and Blade Servers, Doc Number 215119, November 2008 4
Figure 1.
Annual amortized cost of a fully-configured 1U server in a mission-critical (Tier IV) data center
Complexity and management
Increasingly, the greatest ongoing operational cost is the combined management cost associated with
servers, storage, and networking hardware (Figure 2).
Figure 2.
Cost of server hardware in relation to total management costs
Source: IDC Technical Brief Sponsored by HP, Next-Generation Technology for Virtual I/O and Blade Servers,
Doc Number 215119, November 2008
4