HP J9087A User Manual - Page 30

LED Behavior, During the self test, Switch 2650

Page 30 highlights

Installing the Switch Installation Procedures 2. Check the LEDs on the switch as described below. Self Test LED Switch port LEDs Switch 2650 Installing the Switch Power and Fault LEDs When the switch is powered on, it performs its diagnostic self test. Self test takes approximately 50 seconds to complete. Switch 2650-PWR Power Fault hp procurve 1 3 5 7 switch 2650-PWR 2 1 4 6 8 J8165A PoE Status RPS Act EPS LED Mode FDx Fan Spd Test PoE Reset Clear 2 Spd mode: off = 10 Mbps, flash = 100 Mbps, 9 11 10 12 on = 1000 Mbps 13 14 11 13 12 14 15 17 19 21 16 18 20 22 PoE-Ready 10/100Base-TX Ports (1 - 48) 23 Link|M 24 23 24 Test LED LED Behavior During the self test: • Initially, all the switch and port LEDs are on. Most of the LEDs go off and then may come on again during phases of the self test. • For the duration of the self test, the Self Test LED stays on. 2-10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116

2-10
Installing the Switch
Installation Procedures
Installing the Switch
2.
Check the LEDs on the switch as described below.
When the switch is powered on, it performs its diagnostic self test. Self test
takes approximately 50 seconds to complete.
LED Behavior
During the self test:
Initially, all the switch and port LEDs are on. Most of the LEDs go off
and then may come on again during phases of the self test.
For the duration of the self test, the Self Test LED stays on.
Self Test LED
Switch port LEDs
Power and
Fault LEDs
Switch 2650
Switch 2650-PWR
±²³
´µ¶·
¸¹·º»
¼·½·¾
¿À¶Áµ¶·ÃÁÁÁÁÁÁÁµÄÄÁÅÁÆÇÁ´ÈÀ½ÉÁÁÁÁÁÁÁÁÁ
Á
Ĺº½ÊÁÅÁÆÇÇÁ´ÈÀ½ÉÁÁÁÁÁÁÁÁµËÁÅÁÆÇÇÇÁ´ÈÀ½
̵²Í¼·º¶ÎÁÆÇÏÆÇÇк½·ÍÑÒÁ̵»¾½ÁÓÆÁÍÁÔÕÖ
Æ
ÆÆ
ÛÜ
ÆÛ
ÛÔ
̵෻
áºâ¹¾
ÊÀ
±
±²³´µ²¶·
¸¹º»´¼
½
¾¿ÀÁÂÃÄÅ
ÆÇÈ¿ÀÉ
̵²
ãä¾
á³å
±ØËçè´
Ñ·½¾
¼Ì¿
²Ì¿
áºË
¿¾º¾â½
¿À¶
Û
Û
Ô
Ý
Õ
ÆÇ
ÆÛ
ÆÔ
ÆÝ
ÆÕ
ÛÇ
ÛÛ
ÛÔ
Æ
Ü
Þ
ß
é
ÆÆ
ÆÜ
ÆÞ
Æß
Æé
ÛÆ
ÛÜ
ÆÜ
ÆÔ
±²³
Test LED