HP ProLiant DL380 G3 with MSA500 ProLiant DL380 Generation 3 Packaged Cluster - Page 36

Repeat steps 3 and 4 for the right rack rail.

Page 36 highlights

Setup and Installation of the Packaged Cluster 4. Slide the back end of the left rack rail into the inside rear of the rack. Be sure that the pins extend through the holes marked during the rack template procedure. IMPORTANT: Be sure that the scissor-type locking latches engage when the ends of the rail seat into the rack uprights. 5. Repeat steps 3 and 4 for the right rack rail. HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide 2-21

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95

Setup and Installation of the Packaged Cluster
4.
Slide the back end of the left rack rail into the inside rear of the rack. Be sure that
the pins extend through the holes marked during the rack template procedure.
IMPORTANT:
Be sure that the scissor-type locking latches engage when the ends of the rail
seat into the rack uprights.
5.
Repeat steps 3 and 4 for the right rack rail.
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide
2-21