HP ProLiant DL380 G3 with MSA500 ProLiant DL380 Generation 3 Packaged Cluster - Page 73
Windows 2000 installation. Select, con the array controller using ORCA.
View all HP ProLiant DL380 G3 with MSA500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 73 highlights
System Setup and Configuration for Novell NetWare 6 Configuring the Nodes 1. Power on the shared storage (1) and wait for the controllers to initialize. NOTE: You must power on the Smart Array Cluster Storage before powering on the servers. After powering on, wait until the storage system startup complete message is displayed. It may take up to two minutes for the storage system to completely power up. 2. Power on one server, either (2) or (3). NOTE: Do not use the Option ROM Configuration for Arrays (ORCA) utility to configure the Smart Array Cluster Storage. The Array Configuration Utility must be used. While the server boots, the ROM-Based Setup Utility (RBSU) and the ORCA utility are automatically configured to prepare the server for the operating system installation. To configure these utilities manually: - Press the F8 key when prompted during the array controller initialization to configure the array controller using ORCA. - Press the F9 key when prompted during the boot process to change the server settings, such as the settings for language and operating system, using RBSU. The system is set up by default for the English language and a Microsoft Windows 2000 installation. Select NetWare 5.x/6 as the operating system. HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide 6-3