HP Surestore 64 Planning Guide - Page 102

available during installation to remove the rack from the packing crate.

Page 102 highlights

• Equipment rack locations, Ethernet cabling, and the internet protocol (IP) addressing scheme to support optional rack interconnection and HP EFC Server consolidation. • Power requirements, including an optional uninterruptable power supply (UPS). • Security necessary to protect the installation's physical integrity, while maintaining accessibility to the director. • Equipment rack front and rear service clearances, operator clearances, and maintenance access clearances. • Weight of an equipment rack and directors. Either multiple persons or a lift must be available during installation to remove the rack from the packing crate. • Heat dissipation, temperature and humidity requirements. For specific actions required to satisfy this planning task, refer to Table 3 (physical planning and hardware installation tasks), and Table 4 (operational setup tasks). 88 Task 1: Prepare a Site Plan

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172

88
Task 1: Prepare a Site Plan
Equipment rack locations, Ethernet cabling, and the internet protocol (IP) addressing
scheme to support optional rack interconnection and HP EFC Server consolidation.
Power requirements, including an optional uninterruptable power supply (UPS).
Security necessary to protect the installation
s physical integrity, while maintaining
accessibility to the director.
Equipment rack front and rear service clearances, operator clearances, and
maintenance access clearances.
Weight of an equipment rack and directors. Either multiple persons or a lift must be
available during installation to remove the rack from the packing crate.
Heat dissipation, temperature and humidity requirements.
For specific actions required to satisfy this planning task, refer to Table 3 (physical