HP Surestore 64 Planning Guide - Page 126
Task 17: Complete Planning Checklists, Physical Planning and Hardware Installation Tasks cont
View all HP Surestore 64 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 126 highlights
Table 3 Physical Planning and Hardware Installation Tasks (cont'd) Activity Task Owner Due Date Comments Order and deliver fiber-optic cables. Set up local area network (LAN) connections for HP EFC Server and directors. Set up LAN connections to corporate intranet for remote workstation access (optional). Cables are purchased by the customer separately. Plan to have them arrive and laid out before equipment rack delivery. 112 Task 17: Complete Planning Checklists
112
Task 17: Complete Planning Checklists
Order and deliver fiber-optic
cables.
Cables are purchased by the
customer separately. Plan to have
them arrive and laid out before
equipment rack delivery.
Set up local area network (LAN)
connections for HP EFC Server
and directors.
Set up LAN connections to
corporate intranet for remote
workstation access (optional).
Table 3
Physical Planning and Hardware Installation Tasks (cont
’
d)
Activity
Task
Owner
Due
Date
Comments