HP Surestore 64 Planning Guide - Page 125

Activity, Owner, Comments, Table 3 lists physical planning and hardware installation tasks

Page 125 highlights

Configuration Planning Tasks Table 3 lists physical planning and hardware installation tasks, and includes the task owner, due date, and comments. Table 3 Physical Planning and Hardware Installation Tasks Activity Task Owner Due Date Comments Locate the physical facilities. Connect the facility alternating current (AC) power circuits. Obtain an uninterruptable power supply (optional). Obtain two outside-access phone lines. Order the equipment rack with one or more Directors or other managed products. Order Fibre Channel devices and peripherals. Install Fibre Channel devices and peripherals. Route fiber-optic jumper cables. Determine proximity of the equipment rack (with directors) to attached devices (multimode shortwave laser or singlemode longwave laser). If more than one director, consider separate power circuits for availability. Recommended. One for the modem and the second for a telephone. 500 meters for 50/125 mm multimode cable. 175 meters for 62.5/125 mm multimode cable. 10 kilometers for 9/125 mm singlemode cable. Task 17: Complete Planning Checklists 111

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172

Task 17: Complete Planning Checklists
111
Configuration Planning
Tasks
Table 3 lists physical planning and hardware installation tasks, and includes the task
owner, due date, and comments.
Table 3
Physical Planning and Hardware Installation Tasks
Activity
Task
Owner
Due
Date
Comments
Locate the physical facilities.
Connect the facility alternating
current (AC) power circuits.
If more than one director, consider
separate power circuits for
availability.
Obtain an uninterruptable power
supply (optional).
Recommended.
Obtain two outside-access phone
lines.
One for the modem and the
second for a telephone.
Order the equipment rack with one
or more Directors or other
managed products.
Order Fibre Channel devices and
peripherals.
Install Fibre Channel devices and
peripherals.
Route fiber-optic jumper cables.
Determine proximity of the
equipment rack (with directors) to
attached devices (multimode
shortwave laser or singlemode
longwave laser).
500 meters for 50/125 mm
multimode cable.
175 meters for 62.5/125 mm
multimode cable.
10 kilometers for 9/125 mm
singlemode cable.