Tripp Lite SU40KX Owner's Manual for 3-Phase UPS 932688 - Page 48

Control & Test Setup

Page 48 highlights

10 - Display and Configuration (continued) 1 10-5-6 Control & Test Setup Use " " or " " to select "CONTROL & TEST", then press " " to 2 confirm. 1 Use " " or " " to select the desired item, then press " " to confirm. 3 4 5 1 2 6 Battery Auto Test Use " " or " " to select the desired item, then press " " to confirm. Allows for scheduling of a battery test frequency for the duration selected in Section 10-5-3 step 6. 7 8 9 2 3 10 Buzzer Use " " or " " to select enable or disable the buzzer, then press " " to confirm. Silences the audible alarm. 11 12 13 3 14 48

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60

10
1
2
3
48
10 – Display and Configuration
(continued)
10-5-6 Control & Test Setup
Use “
” or ”
” to select “CONTROL & TEST”, then press ”
” to
confirm.
Use “
” or ”
” to select the desired item, then press ”
” to
confirm.
Battery Auto Test
Use “
” or ”
” to select the desired item, then press ”
” to
confirm. Allows for scheduling of a battery test frequency for the
duration selected in
Section 10-5-3
step 6.
Buzzer
Use “
” or ”
” to select enable or disable the buzzer, then press
” to confirm. Silences the audible alarm.
1
2
3