Troy-Bilt CSV 060 Operation Manual - Page 8
Hose Assembly - chipper
View all Troy-Bilt CSV 060 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
4. Loosen the wing nut that secures the rope guide to the 2. Pull spring loaded pin out on the base and align pin with right side of upper handle. the first hole (closest to the end of the tube) in the hose a. Slowly pull starter rope out of engine. adapter. See Fig. 3-4B. b. Slip the starter rope into the rope guide. Tighten the 3. Release the pin to lock the hose in place. wing nut. See Fig. 3-3. 4. Lay hose tubing in curved end of hose handle next to chipper chute and into hose cradle (if applicable). See Fig. 3-5A & B. B A C A Figure 3-3 Hose Assembly 1. Slide hose adapter of hose assembly into the base adapter located on the left front of the Chipper shredder Vacuum. See Fig. 3-4A. B† † If Applicable Figure 3-5 5. Snap the hose handle first into the upper hose handle bracket and then into the lower hose handle bracket. See Fig. 3-5C. A B Align Pin with this Hole Figure 3-4 8 Section 3 - Assembly & Set-Up