3Ware 9500S-8MI Installation Guide - Page 112
For the full-height board, the bracket sits on top of the board, removed in Step 2.
![]() |
UPC - 693494950816
View all 3Ware 9500S-8MI manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 112 highlights
Appendix A. Installing the Battery Backup Unit 6 Align the Battery Backup Unit to the controller with these connectors: Mate the connector on the BBU with the receptacle on the controller. Match the plastic post on the BBU with the hole on the controller. 7 Press down gently until the BBU is seated. Figure 8. BBU attached to controller 8 Reconnect the PCI bracket, using the phillips screws you removed in Step 2. For the full-height board, the bracket sits on top of the board, and screws are inserted from the bottom. For the half-height board, the bracket sits on the bottom of the board, with screws inserted from the top. 104 3ware 9000 Series Serial ATA RAID Controller Installation Guide
![](/manual_guide/products/3ware-9500s4lp-installation-guide-4465fc6/112.png)
Appendix A. Installing the Battery Backup Unit
104
3ware 9000 Series Serial ATA RAID Controller Installation Guide
6
Align the Battery Backup Unit to the controller with these
connectors:
Mate the connector on the BBU with the receptacle on the
controller.
Match the plastic post on the BBU with the hole on the
controller.
7
Press down gently until the BBU is seated.
Figure 8.
BBU attached to controller
8
Reconnect the PCI bracket, using the phillips screws you
removed in Step 2.
For the full-height board, the bracket sits on top of the board,
and screws are inserted from the bottom.
For the half-height board, the bracket sits on the bottom of the
board, with screws inserted from the top.