ATI Xpert 98 User Manual - Page 82

Scheduled

Page 82 highlights

RAIDXpert User Manual Scheduled To schedule a Rebuild: 1. Click Logical Drive View in Tree View. 2. Click the Logical Drive you want to rebuild. 3. Click the Rebuild tab in Management View. 4. Click a Single Disk (unassigned physical drive) to use as a replacement drive. Available drives have a white frame. Selected drives have a red frame. 5. Click the Enable option. 6. From the dropdown menus, select a start time. Start time is based on a 24-hour clock. 7. Click in Start At field to display a popup calendar. 8. Click the start date in the calendar or enter a date manually. 9. Click the Schedule button. 76

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120

RAIDXpert User Manual
76
Scheduled
To schedule a Rebuild:
1.
Click
Logical Drive View
in Tree View.
2.
Click the
Logical Drive
you want to rebuild.
3.
Click the
Rebuild
tab in Management View.
4.
Click a Single Disk (unassigned physical drive) to use as a replacement
drive.
Available drives have a white frame. Selected drives have a red frame.
5.
Click the
Enable
option.
6.
From the dropdown menus, select a start time.
Start time is based on a 24-hour clock.
7.
Click in Start At field to display a popup calendar.
8.
Click the start date in the calendar or enter a date manually.
9.
Click the
Schedule
button.