Amana ART318FFDW Installation Instructions - Page 18

Final Installation

Page 18 highlights

Final Installation Installing the access cover and forming the copper tubing 1. Top freezer models only: Add grommet to condenser to avoid contact between valve and condenser area. 3. Loop the copper tubing coming from the water valve as shown. Position the coiled copper tubing near the center of the unit so that it forms an "accordion-fold" (as shown in the diagram below) when it is moved to and from the wall. Grommet 2. Reinstall the rear access cover on the refrigerator so the water valve tubing is inside the cover, and the copper water line is outside (see the diagram below), then secure the cover with the hex-head screws you removed earlier. NOTE: For side by side models, gently route the plastic tubing through the slot in the metal access cover. Form tubing loops as shown Hex-head screws Rear access cover Copper tubing Place water valve tubing behind cover Hex-head screws Installing the access cover and forming the copper tubing 18

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64

18
Final Installation
Installing the access cover and
forming the copper tubing
1.
Top freezer models only: Add grommet to condenser to avoid
contact between valve and condenser area.
2.
Reinstall the rear access cover on the refrigerator so the
water valve tubing is inside the cover, and the copper water
line is outside (see the diagram below), then secure the cover
with the hex-head screws you removed earlier.
NOTE:
For side by side models, gently route the plastic
tubing through the slot in the metal access cover.
3.
Loop the copper tubing coming from the water valve as
shown. Position the coiled copper tubing near the center of
the unit so that it forms an “accordion-fold” (as shown in the
diagram below) when it is moved to and from the wall.
Copper tubing
Installing the access cover and forming the copper tubing
Place water
valve tubing
behind cover
Form tubing
loops as shown
Rear access
cover
Hex-head
screws
Hex-head
screws
Grommet