Bowflex Blaze Assembly Manual - Page 8
Step 3 - Attach the Squat Platform to the Main, Assembly
View all Bowflex Blaze manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
Assembly Guide Step 3 - Attach the Squat Platform to the Main Assembly Locate the following items: • From Step 2 - Base Platform/Lat Tower (Main) Assembly • Item #5 - Squat Platform • Item #I - (2) 3/8" X 3 1/4" Button Head Screws • Item #N - (4) 3/8" Washers • Item #O - (2) 3/8" Nylock Nuts • Item #Q - (4) Bolt Covers With the Base Frame/Lower Lat Tower (Main) Assembly (from Step 2) on the floor, carefully lift up the front of the unit, then slide the Squat Platform (Rubber-pad side down) underneath both Legs. Line up the bolt holes in the brackets on the Squat Platform with the bolt holes on each Leg (directly behind the pulleys), as shown in Figure 3a. Place (2) 3/8" Washers (Item #N) over the ends of (2) 3/8" X 3 1/4" Button Head Screws (Item #I) - one washer per screw. Insert the screws through the lined-up holes as shown, then place (2) 3/8" Washers and (2) 3/8" Nylock Nuts (Item #O) over the end of each screw, securely tightening them in place. Completely tighten hardware installed during Step 3. Place (2) Bolt Covers (Item #Q) over the Nylock Nuts installed in this step - one cover per nut. Then, place (2) additional Bolt Covers over the J-bolts, one cover per bolt, that attach the Pulleys to the Leg, as shown in Figure 3b. Figure 3a O Base Platform/Lower Lat Tower Assembly N I Bolt Holes Leg 5 Squat Platform Brackets Figure 3b Q 6