Dell Force10 Z9000 Dell Force10 Z9000 System Quick Start Guide - Page 11
Power Up Sequence, Supply Power and Power Up the System, AC Power - switch
View all Dell Force10 Z9000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
Power Up Sequence Supply Power and Power Up the System Dell Force10 recommends re-inspecting your system prior to powering up. Verify that: • The equipment is properly secured to the rack and properly grounded. • The equipment rack is properly mounted and grounded. • The ambient temperature around the unit (which may be higher than the room temperature) is within the limits specified for the Z9000. • There is sufficient airflow around the unit. • The input circuits are correctly sized for the loads and that sufficient overcurrent protection devices are used. • All protective covers are in place. NOTE: A US AC power cable is included in the shipping container for powering up an AC power supply. All other power cables must be ordered separately. CAUTION: Electrostatic discharge (ESD) damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the Z9000 and its components. When the chassis powers up, the fans come on at high speed. The fan speed slows as the system boots up. The SYS LED does not light up until the boot-up sequence is complete. When the boot-up is complete, the SYS LED is steadily lit green. AC Power Connect the plug to each AC power connector, making sure that the power cord is secure. As soon as the cable is connected between the Z9000 and the power source, the chassis is powered-up; there is no on/off switch. DC Power To connect the plug to the DC power connector, follow the steps below: Installing the Hardware 9