Dell PowerStore 1200T EMC PowerStore Installation and Service Guide for PowerS - Page 28

Install an NVMe expansion enclosure

Page 28 highlights

Expansion B enclosure 2 A Expansion B enclosure 1 A Expansion B enclosure 0 A Node B A Figure 19. Cabling the base enclosure to three expansion enclosures NOTE: For additional cabling diagrams, refer to the Cable Label Worksheet. Install an NVMe expansion enclosure Take the following actions to install an NVMe expansion enclosure into the system during the initial system installation or to install the first NVMe expansion enclosure into a running system. NOTE: During the initial system installation, do not power on the system until you have finished cabling all of the expansion enclosures. CAUTION: On a running cluster, if you are adding an expansion enclosure after installing the first expansion enclosure during initial system installation, you must power on the new expansion enclosure before attaching the back-end cables. 28 Install a new base enclosure and optional expansion enclosure

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191

B
A
Expansion
enclosure 0
B
A
Node
B
A
Expansion
enclosure 1
B
A
Expansion
enclosure 2
Figure 19. Cabling the base enclosure to three expansion enclosures
NOTE:
For additional cabling diagrams, refer to the Cable Label Worksheet.
Install an NVMe expansion enclosure
Take the following actions to install an NVMe expansion enclosure into the system during the initial system installation or to
install the first NVMe expansion enclosure into a running system.
NOTE:
During the initial system installation, do not power on the system until you have finished cabling all of the expansion
enclosures.
CAUTION:
On a running cluster, if you are adding an expansion enclosure after installing the first expansion
enclosure during initial system installation, you must power on the new expansion enclosure before attaching
the back-end cables.
28
Install a new base enclosure and optional expansion enclosure