Dell S4048-ON EMC PowerSwitch Installation Guide March 2021 - Page 16

S4048–ON installation, Unpack the switch, Unpack, Rack or cabinet hardware installation

Page 16 highlights

5 S4048-ON installation To install the S4048-ON switch, Dell EMC recommends completing the installation procedures in the order presented in this chapter. Always handle the S4048-ON and its components with care. Avoid dropping the switch or its field replaceable units (FRUs). NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S4048-ON and its components. As with all electrical devices of this type, take all the necessary safety precautions to prevent injury when installing this switch. Topics: • Unpack the switch • Rack or cabinet hardware installation • SFP+ and QSFP+ optic installation • Switch power-up Unpack the switch NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage. When unpacking the S4048-ON switch, make sure that the following items are included: ● One S4048-ON switch ● One RJ-45 to DB-9 female cable ● Two sets of rail kits, no tools required ● One PSU-a second PSU is sold separately ● One AC country/region-specific power cord ● S4048-ON Getting Started Guide ● Safety and Regulatory Information ● Warranty and Support Information Unpack 1. Place the container on a clean, flat surface and cut all straps securing the container. 2. Open the container or remove the container top. 3. Carefully remove the switch from the container and place it on a secure and clean surface. 4. Remove all packing material. 5. Inspect the product and accessories for damage. Rack or cabinet hardware installation You may either place the switch on the rack shelf or mount the switch directly into a 19" wide, EIA-310- E-compliant rack- four-post, two-post, or threaded methods. The ReadyRails™ system is provided for one 1U front-rack and two-post installations. The ReadyRails system includes two separately packaged rail assemblies and two rails that are shipped attached to the sides of the switch. WARNING: This is a condensed reference. Read the safety instructions in your Safety, Environmental, and Regulatory information booklet before you begin. 16 S4048-ON installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

S4048–ON installation
To install the S4048–ON switch, Dell EMC recommends completing the installation procedures in the order presented in this
chapter.
Always handle the S4048–ON and its components with care. Avoid dropping the switch or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the S4048–ON and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
Topics:
Unpack the switch
Rack or cabinet hardware installation
SFP+ and QSFP+ optic installation
Switch power-up
Unpack the switch
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4048-ON switch, make sure that the following items are included:
One S4048-ON switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
One PSU—a second PSU is sold separately
One AC country/region-specific power cord
S4048–ON Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Unpack
1.
Place the container on a clean, flat surface and cut all straps securing the container.
2.
Open the container or remove the container top.
3.
Carefully remove the switch from the container and place it on a secure and clean surface.
4.
Remove all packing material.
5.
Inspect the product and accessories for damage.
Rack or cabinet hardware installation
You may either place the switch on the rack shelf or mount the switch directly into a 19" wide, EIA-310- E-compliant rack—
four-post, two-post, or threaded methods. The ReadyRails™ system is provided for one 1U front-rack and two-post installations.
The ReadyRails system includes two separately packaged rail assemblies and two rails that are shipped attached to the sides of
the switch.
WARNING:
This is a condensed reference. Read the safety instructions in your Safety, Environmental, and
Regulatory information booklet before you begin.
5
16
S4048–ON installation