Dell S4048-ON EMC PowerSwitch Installation Guide March 2021 - Page 20

S4048-ON installation, 1U front-rack installation, Four-post threaded configuration

Page 20 highlights

Figure 9. Four-post threaded configuration 2. For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end, item 2. S4048-ON installation You can mount the switch in the 1U front-rack or 1U flush and center two-post configurations. The following is an example of a front-rack configuration: For the 1U flush and center two-post configurations, slide the switch into the rails in the same manner as the four-post configurations. 1U front-rack installation You must configure the rails that are attached to the switch. 1. Attach the inner chassis members switch rails to the S4048-ON switch. Item 3 shows the detail for the front standoff with the locking tab. 20 S4048-ON installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

Figure 9. Four-post threaded configuration
2.
For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end, item 2.
S4048-ON installation
You can mount the switch in the 1U front-rack or 1U flush and center two-post configurations. The following is an example of a
front-rack configuration:
For the 1U flush and center two-post configurations, slide the switch into the rails in the same manner as the four-post
configurations.
1U front-rack installation
You must configure the rails that are attached to the switch.
1.
Attach the inner chassis members switch rails to the S4048–ON switch.
Item 3 shows the detail for the front standoff with the locking tab.
20
S4048–ON installation