Dell S4048-ON EMC PowerSwitch Installation Guide March 2021 - Page 20
S4048-ON installation, 1U front-rack installation, Four-post threaded configuration
View all Dell S4048-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
Figure 9. Four-post threaded configuration 2. For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end, item 2. S4048-ON installation You can mount the switch in the 1U front-rack or 1U flush and center two-post configurations. The following is an example of a front-rack configuration: For the 1U flush and center two-post configurations, slide the switch into the rails in the same manner as the four-post configurations. 1U front-rack installation You must configure the rails that are attached to the switch. 1. Attach the inner chassis members switch rails to the S4048-ON switch. Item 3 shows the detail for the front standoff with the locking tab. 20 S4048-ON installation
Figure 9. Four-post threaded configuration
2.
For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end, item 2.
S4048-ON installation
You can mount the switch in the 1U front-rack or 1U flush and center two-post configurations. The following is an example of a
front-rack configuration:
For the 1U flush and center two-post configurations, slide the switch into the rails in the same manner as the four-post
configurations.
1U front-rack installation
You must configure the rails that are attached to the switch.
1.
Attach the inner chassis members switch rails to the S4048–ON switch.
Item 3 shows the detail for the front standoff with the locking tab.
20
S4048–ON installation