Dell S5148F-ON EMC PowerSwitch Installation Guide July 2021 - Page 21
Two-post center-mount installation, Two-post flush-mount configuration
View all Dell S5148F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
Figure 10. Two-post flush-mount configuration 2. Attach one rail to the front post flange with two user-supplied screws. See item 2. 3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws. See item 3. 4. Repeat this procedure for the second rail. Two-post center-mount installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. CAUTION: Your switch is not NEBS Earthquake Z4-compliant if you this installation method. 1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws. See item 1. S5148F-ON switch installation 21
Figure 10. Two-post flush-mount configuration
2.
Attach one rail to the front post flange with two user-supplied screws. See item 2.
3.
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws. See item 3.
4.
Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
CAUTION:
Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
1.
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws. See item 1.
S5148F-ON switch installation
21