Dell S5148F-ON EMC PowerSwitch Installation Guide July 2021 - Page 22

Four-post threaded installation, Two-post center-mount threaded round-hole installation

Page 22 highlights

Figure 11. Two-post center-mount threaded round-hole installation 2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws. See item 2 and 3. 3. Repeat this procedure for the second rail. Four-post threaded installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. CAUTION: To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1. 1. For this installation, remove the tool-less latch castings from the front side of each ReadyRails assembly. See item 1. Use a Torx screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch casting. Retain the castings for future rack requirements. 22 S5148F-ON switch installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45

Figure 11. Two-post center-mount threaded round-hole installation
2.
Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws. See item 2 and 3.
3.
Repeat this procedure for the second rail.
Four-post threaded installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
CAUTION:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in
Step 1.
1.
For this installation, remove the tool-less latch castings from the front side of each ReadyRails assembly. See item 1. Use a
Torx screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch
casting. Retain the castings for future rack requirements.