Dell S5148F-ON EMC PowerSwitch Installation Guide July 2021 - Page 22
Four-post threaded installation, Two-post center-mount threaded round-hole installation
![]() |
View all Dell S5148F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 22 highlights
Figure 11. Two-post center-mount threaded round-hole installation 2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws. See item 2 and 3. 3. Repeat this procedure for the second rail. Four-post threaded installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. CAUTION: To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1. 1. For this installation, remove the tool-less latch castings from the front side of each ReadyRails assembly. See item 1. Use a Torx screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch casting. Retain the castings for future rack requirements. 22 S5148F-ON switch installation
![](/manual_guide/products/dell-s5148fon-emc-powerswitch-installation-guide-2021-a93c732/22.png)