Dell S5148F-ON EMC PowerSwitch Installation Guide July 2021 - Page 24

Attach switch rail, Front rack installation, S5148F-ON switch installation

Page 24 highlights

Figure 13. Attach switch rail 2. After installing both switch rails, line them up on the previously mounted ReadyRails and slide the switch in until it is flush with front of rack. To keep the switch from inadvertently sliding out of the rack and falling, about 3 inches before you fully insert your switch, the rail locking feature engages. Figure 14. Front rack installation 24 S5148F-ON switch installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45

Figure 13. Attach switch rail
2.
After installing both switch rails, line them up on the previously mounted ReadyRails and slide the switch in until it is flush
with front of rack. To keep the switch from inadvertently sliding out of the rack and falling, about 3 inches before you fully
insert your switch, the rail locking feature engages.
Figure 14. Front rack installation
24
S5148F-ON switch installation