Dell S5148F-ON EMC PowerSwitch Installation Guide July 2021 - Page 23
Switch installation, 1U front-rack installation
View all Dell S5148F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
Figure 12. Four-post threaded round-hole installation 2. For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end. Switch installation You can mount the switch in the 1U front-rack or 1U two-post, flush or center configuration. The following is an example of a front-rack configuration: For the 1U two-post configurations, slide the switch into the rails in the same manner as the four-post configurations. 1U front-rack installation Configure the rails that are attached to the switch. NOTE: For more instructions, see the installation instruction labels on the rail. 1. Attach the inner switch rails to the S5148F-ON switch. Line up the rail with the mounting heads and attach the rail to the switch. Slide the rail back until it locks into place. The following shows the detail of the front standoff with the locking tab: S5148F-ON switch installation 23