Fluke 1550B FE 1550B Users Manual - Page 20
Polarization Index (PI), Dielectric Absorption Ratio, Capacitance, Performing an Insulation Test
View all Fluke 1550B manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
1550B Users Manual Polarization Index (PI) As part of the insulation test, the Meter measures and stores polarization index (PI), when appropriate. Since, by definition, a polarization index test requires 10 minutes to complete, it is measured and stored as invalid data for all insulation tests under 10 minutes. When an insulation test is 10 minutes or more the polarization test is completed and stored. The results are available for display during a test by pressing the R button or by storing the test results and scanning the RESULTS fields. The field is identified by PI=. PI = R × 10 min R × 1 min Dielectric Absorption Ratio As part of the insulation test, the Meter measures and stores dielectric absorption ratio (DAR), when appropriate. Since, by definition, a DAR test requires 1 minute to complete, it is measured and stored as invalid data for all insulation tests under 1 minute. When an insulation test is 1 minute or more the DAR test is included in the results. The results are available for display during a test by pressing the R button or by storing the test results and scanning the RESULTS fields. The field is identified by DAR=. DAR = R × 1 min R × 30 sec Capacitance As part of the insulation test, the Meter measures and stores capacitance when appropriate. The results are available for display during a test by pressing the R button or by storing the test results and scanning the RESULTS fields. The field is identified by C=. Performing an Insulation Test XW Warning Measuring insulation resistance requires the application of potentially dangerous voltages to the circuit. This may include exposed bonded metalwork. To avoid possible electric shock or personal injury: • Remove all power from the circuit under test and discharge circuit capacitance before testing a circuit with the Meter. • Before proceeding, ensure that the installation is wired correctly and no personnel are endangered by any tests. • First connect the test leads to the Meter inputs before you make connection to the circuit under test. 14