GE JXGB90S Use and Care Manual - Page 20
Preparation
UPC - 084691143420
View all GE JXGB90S manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
Installation Instructions PREPARATION TOOLS AND PARTS NEEDED • Large flat-blade screwdriver • Phillips screwdriver • 3/8″ socket and ratchet • Saw • Carpenter's square • Pipe wrench • Gas line shut off valve • Pipe joint sealant for use with gas connections that resists action of LP gas For flexible connection where local codes permit: • Flexible metal tubing (same 3/4″ or 1/2″ I.D. as gas supply line) • Flare union adapter for connection to supply line (3/4″ NPT x 3/4″ I.D. or 1/2″ NPT x 1/2″ I.D.) • Flare union adapter for connection to regulator (1/2″ NPT x 3/4″ I.D. or 1/2″ I.D.) For rigid connection: • Pipe fittings as required PREPARING FOR INSTALLATION Tie down bolt on each end *Blower can be swiveled 90° Grease Container 29″ ± 1⁄ 16″ 73.66 ± .16 cm Pressure Regulator Wiring Box Cover 21″ ± 1⁄ 16″ 53.5 ± .16 cm 9″ 22.86 cm 15⁄ 16″ 2.38 cm Minimum Clearance 91⁄ 2″ 24.13 cm 143⁄ 16″ 36.04 cm 17⁄ 8″ Min. 4.76 cm IMPORTANT Motor Clearance-Provide 2″ min. (5.1 cm) cabinet clearance to motor for cooling purpose. NOTE: Where possible, 6″ (15.2 cm) is recommended for motor/blower service. Side Clearance-Grills installed near a side wall should allow a minimum clearance of 8″ (20.3 cm). You must allow room enough to remove and empty grease container(s). CAUTION: Warranty is void on equipment installed other than as recommended by GE. Recommended wall caps and transitions must be used for proper operation and installation. Select appropriate duct cutout. (See ducting installation instructions.) 43⁄ 16″ 10.64 cm 181⁄ 2″ 47 cm Minimum Clearance 2″ 5.08 cm Minimum Clearance Appliance Pressure Regulator 141⁄ 2″ 36.83 cm Grease Container 127⁄ 8″ 32.7 cm * Blower may be rotated for horizontal or vertical direction by loosening nuts around blower inlet. Accessible inside ventilation chamber. 20