HP Integrity BLc7000 HP 10GbE Pass-Thru Module User Guide - Page 12

Installing SFP+ transceivers

Page 12 highlights

• The system/info command displays image version, board revision, or chip revisions. • The effect from any CLI command is immediate. For example, configuring auto-negotiation on a port takes effect when the command is completed. • Flow control is not configurable because the pass-thru module cannot handle or generate pause packets. When using the 10GbE Pass-Thru Module, you must ensure that your pause configuration is correct for both link partners. Installing SFP+ transceivers CAUTION: Disconnect all cables before removing or installing an SFP+ transceiver, because of the potential damage to the cables, the cable connector, or the optical interfaces in the SFP+ transceiver. Removing and installing an SFP+ transceiver can shorten the life of the product. Do not remove and insert SFP+ transceivers more often than is necessary. CAUTION: HP recommends attaching an ESD-preventative wrist strap to your wrist and to a bare metal surface on the chassis to prevent electrostatic discharge. CAUTION: When not using the fiber-optic SFP+ transceiver and cable, be sure to install the dust plugs on both. The plugs and caps protect the SFP+ transceiver ports and cables from contamination and ambient light. 1. Remove the dust plug and save for future use. IMPORTANT: Use only HP-approved SFP+ transceivers. 2. Insert the SFP+ transceiver. With latch closed, be sure that the transceiver is fully seated and secure. CAUTION: If you plan to install the SFP+ transceiver into the bottom row of the module, before installation, rotate the SFP+ transceiver 180 degrees from the position shown in the illustration. Installing the pass-thru module 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34

Installing the pass-thru module
12
The system/info command displays image version, board revision, or chip revisions.
The effect from any CLI command is immediate. For example, configuring auto-negotiation on a port
takes effect when the command is completed.
Flow control is not configurable because the pass-thru module cannot handle or generate pause
packets. When using the 10GbE Pass-Thru Module, you must ensure that your pause configuration is
correct for both link partners.
Installing SFP+ transceivers
CAUTION:
Disconnect all cables before removing or installing an SFP+ transceiver, because of
the potential damage to the cables, the cable connector, or the optical interfaces in the SFP+
transceiver.
Removing and installing an SFP+ transceiver can shorten the life of the product. Do not remove
and insert SFP+ transceivers more often than is necessary.
CAUTION:
HP recommends attaching an ESD-preventative wrist strap to your wrist and to a
bare metal surface on the chassis to prevent electrostatic discharge.
CAUTION:
When not using the fiber-optic SFP+ transceiver and cable, be sure to install the
dust plugs on both. The plugs and caps protect the SFP+ transceiver ports and cables from
contamination and ambient light.
1.
Remove the dust plug and save for future use.
IMPORTANT:
Use only HP-approved SFP+ transceivers.
2.
Insert the SFP+ transceiver. With latch closed, be sure that the transceiver is fully seated and secure.
CAUTION:
If you plan to install the SFP+ transceiver into the bottom row of the module, before
installation, rotate the SFP+ transceiver 180 degrees from the position shown in the illustration.