HP Integrity BLc7000 HP 10GbE Pass-Thru Module User Guide - Page 13

Replacing a pass-thru module

Page 13 highlights

Replacing a pass-thru module Replacing an existing module CAUTION: Removing the pass-thru module from a powered enclosure results in the loss of network communications between the server blade network ports and the network infrastructure. For continued blade-server network communication and services availability before removing the module, redirect critical high-availability services or applications to use the redundant network ports. CAUTION: Do not connect the pass-thru module until after configuration. 1. Remove and label the cables. 2. Remove the module. 3. Slide the new module fully into the interconnect bay. For more installation information, see "Installing the module (on page 9)." 4. Close the ejector lever and wait for the module to boot completely. Replacing a pass-thru module 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34

Replacing a pass-thru module
13
Replacing a pass-thru module
Replacing an existing module
CAUTION:
Removing the pass-thru module from a powered enclosure results in the loss of
network communications between the server blade network ports and the network
infrastructure.
For continued blade-server network communication and services availability before removing
the module, redirect critical high-availability services or applications to use the redundant
network ports.
CAUTION:
Do not connect the pass-thru module until after configuration.
1.
Remove and label the cables.
2.
Remove the module.
3.
Slide the new module fully into the interconnect bay. For more installation information, see "Installing
the module (on page
9
)."
4.
Close the ejector lever and wait for the module to boot completely.